The C-10 practice test that actually gets you ready.
Practice with 1,202 exam-style questions written to the 2025 California Electrical Code — each with a full explanation and the exact code section behind the answer. Start free, no credit card.
- 1,202 exam-style questions
- Explanation + code citation on every answer
- Two free modules to start
Free to start · one-time $148.75 for full access · no subscription.
Every question explained and cited to the code.
Try 10 practice questions from the course
One from every section of both exams, straight from the course. Pick your answer, then check it.
Using the optional multifamily method, a 20-unit apartment building applies a Table 220.84 demand factor of:
- A. 45 percent
- B. 43 percent
- C. 41 percent
- D. 38 percent
Show the answer
Answer: D. 38 percent
Table 220.84(B) gives 38 percent for 18-20 dwelling units.
Reference: CEC Table 220.84
Under its scope section 725.1, Article 725 of the 2025 CEC covers:
- A. electric light and power circuits
- B. power-limited circuits, including power-limited remote-control and signaling circuits, that are not an integral part of a device or of utilization equipment
- C. services
- D. motors
Show the answer
Answer: B. power-limited circuits, including power-limited remote-control and signaling circuits, that are not an integral part of a device or of utilization equipment
725.1 Scope: this article covers power-limited circuits, including power-limited remote-control and signaling circuits, that are not an integral part of a device or of utilization equipment.
Reference: CEC Article 725 (2023 rewrite) / Article 724 (Class 1)
A 15/20 A receptacle in a WET location must have:
- A. any standard cover
- B. an enclosure that is weatherproof whether or not the attachment plug cap is inserted
- C. no cover
- D. a metal blank plate
Show the answer
Answer: B. an enclosure that is weatherproof whether or not the attachment plug cap is inserted
Receptacles of 15 and 20 amperes, 125 and 250 volts, in a wet location must have an enclosure that is weatherproof whether or not the attachment plug cap is inserted. An outlet box hood used for this must be listed and identified as extra-duty (CEC 406.9(B)).
Reference: CEC 406.9(B)(1)
Using I = E ÷ R, a 240 V heating element with a resistance of 16 ohms draws a current of:
- A. 7.5 A
- B. 15 A
- C. 30 A
- D. 3,840 A
Show the answer
Answer: B. 15 A
I = E ÷ R = 240 V ÷ 16 ohms = 15 A.
Reference: Arithmetic
Under 2405.4, the written description of an employer's assured equipment grounding conductor program must be:
- A. Kept only at the main office
- B. Filed with the serving utility
- C. Available at the job site for inspection and copying
- D. Mailed to each worker's home
Show the answer
Answer: C. Available at the job site for inspection and copying
2405.4: the written description of the program, including the employer's specific procedures, shall be available at the job site for inspection and copying by Cal/OSHA and any affected employee.
Reference: T8 2405.4
In addition to refunding the buyer's money within the 10-day window, the seller must also:
- A. Retain a 10% restocking fee
- B. Record a mechanics lien on the property
- C. Report the cancellation to the CSLB
- D. Cancel any security interest arising out of the transaction
Show the answer
Answer: D. Cancel any security interest arising out of the transaction
The Notice of Cancellation required by Civil Code 1689.7 tells the buyer that payments will be returned within 10 days following receipt by the seller of the cancellation notice, and any security interest arising out of the transaction will be canceled.
Reference: Civil Code §1689.7
The contractor license bond increased to its current amount effective:
- A. it never changed
- B. January 1, 2023
- C. 2010
- D. 2026
Show the answer
Answer: B. January 1, 2023
The bond increased to $25,000 effective January 1, 2023.
Reference: SB 607 (B&P §7071.6)
The version of BPC 7125 that limits the no-employee workers' compensation exemption to a joint venture with no employees becomes operative on:
- A. January 1, 2023
- B. January 1, 2026
- C. January 1, 2027
- D. January 1, 2028
Show the answer
Answer: D. January 1, 2028
BPC 7125, in the version whose exemption covers only a licensee organized as a joint venture under Section 7029 that has no employees, states: this section shall become operative on January 1, 2028.
Reference: SB 216 (2022) as amended by SB 1455 (2024)
On California PUBLIC works projects, retention is generally capped at:
- A. 10 percent
- B. 5 percent
- C. 20 percent
- D. there is no cap
Show the answer
Answer: B. 5 percent
Public Contract Code 7201(b)(1): retention withheld from any payment on a public work shall not exceed 5 percent of the payment, and total retention shall not exceed 5 percent of the contract price.
Reference: CA Public Contract Code §7201
Before filing a petition to release a lien that was not timely foreclosed, the owner must first:
- A. Pay the disputed amount into court in full
- B. Wait a full year from recording of the lien
- C. Give the claimant a demand to release the lien at least 10 days before filing
- D. Obtain a completed jury trial on the debt
Show the answer
Answer: C. Give the claimant a demand to release the lien at least 10 days before filing
Section 8482 bars an owner from petitioning for a release order unless, at least 10 days before filing, the owner gave the claimant notice demanding that the claimant execute and record a release of the lien.
Reference: CA Civil Code §8482
Want your score?
Take the free 10-question check: you get your score and your weakest section, and the answer to every question you miss.
Take the free testFull access has 1,202 questions like these, each with its explanation and code section. Get lifetime access
Prefer paper? Download 40 practice questions as a free PDF
Practice every section of the real exam
The C-10 is two exams. Our question bank covers every official C-10 Trade section, weighted the way CSLB weights the Trade exam, plus the Law & Business exam.
C-10 Trade 100 Q
Technical knowledge · 3½ hours
- Planning & Estimating · 28%
- Rough Wiring · 27%
- Finish Wiring & Trim · 11%
- Startup, Troubleshooting & Maintenance · 16%
- Safety · 18%
Law & Business 115 Q
Legal & business knowledge · 3½ hours
- Contracts & Change Orders
- Bonds, Insurance & Licensing
- Employment, Payroll & Safety
- Estimating, Bidding & Project Management
- Lien Law
How the practice test works
Built to make the material stick — not just to quiz you once.
Active recall
You learn by being asked. Every question gives an instant explanation so you understand why the right answer is right.
Code citations
Each answer names the exact section of the 2025 California Electrical Code, so you can trust it and look it up.
Spaced repetition
Questions you miss come back on a smart schedule until they're locked in for exam day.
Full-length timed exams
Two complete mock exams matching the real Trade and Law & Business format and timing.
Readiness tracking
See your accuracy by section so you know exactly what to drill — and when you're ready to sit the real test.
Practice anywhere
Mobile-first, so you can run questions on a break, in the truck, or on the couch.
Practice test questions
Common questions about the C-10 practice exam.
Is there a free C-10 practice test?
How many practice questions are there?
What score do I need to pass the C-10 exam?
Are the practice questions like the real C-10 exam?
Is the practice test on the current code?
Can I take the practice test on my phone?
New to the license? Read what's on the C-10 exam, the exam format & passing score, and how to study for the C-10 exam. Sitting the Law & Business exam too? Read the Law & Business exam guide. Or see why you need the C-10 and pricing.
Start your C-10 practice test today.
Free to start. Upgrade once for lifetime access — no subscription.
Start practicing free